LMS Class 2P 4-4-0

LMS Class 2P 4-4-0
Power type Steam
Builder LMS Derby Works (98)
LMS Crewe Works (40)
Build date 1928
Total produced 138
Configuration 4-4-0
UIC classification 2′B h
Gauge 4 ft 8 12 in (1,435 mm)
Leading wheel
diameter
42.5 in (1,080 mm)
Driver diameter 6 ft 9 in (2,057 mm)
Length 54 ft 4 in (16.56 m)
Locomotive weight 54.05 long tons (54.9 t)
Locomotive & tender
combined weight
96.25 long tons (97.8 t)
Fuel type Coal
Fuel capacity 4 long tons (4.1 t)
Water capacity 3,500 imp gal (16,000 l)
Boiler LMS type G7S
Boiler pressure 180 psi (1.24 MPa)
Firegrate area 21 sq ft (2.0 m2)
Heating surface:
Tubes
1,034 sq ft (96.1 m2)
Heating surface:
Firebox
124 sq ft (11.5 m2)
Superheater area 252 sq ft (23.4 m2) later 246 sq ft (22.9 m2)
Cylinders Two, inside
Cylinder size 19 × 26 in (483 × 660 mm)
Valve gear Stephenson
Valve type Piston valves
Tractive effort 17,730 lbf (78.87 kN)
Class 2P
Retired 1934, 1954–1962
Disposition All scrapped

The London Midland and Scottish Railway Class 2P 4-4-0 was a class of steam locomotive designed for light passenger work.

Contents

Overview

The class was introduced in 1928 and was a post-grouping development of the Midland Railway 483 Class with modified dimensions and reduced boiler mountings.

The numbering continued from where the Midland engines left off at 563 and eventually reached 700. 138 were built, though numbering is slightly complicated by renumberings and transfers.

Models

Hornby produce a 00 gauge model based on the old Dapol (formerly Airfix) tooling which is reasonably accurate. Graham Farish produced an N scale model of the 4P 4-4-0 Compound when they were in Poole, Dorset, and the chassis for this could be modified to represent the 2P. Union Mills on the Isle of Man make a 2P in N gauge.

Details

Numbers Lot No. Date
built
Built at Notes
Original 2nd BR
563–571 40563–40571 49 1928 Derby
572 601 40601 49 1928 Derby Experimentally fitted with Owen's double port exhaust valves from new and renumbered immediately after entering service
572 40572 49 1928 Derby Replacement for first No. 572
573–574 40573–40574 49 1928 Derby
575–576 633–634 40633–40634 49 1928 Derby Transferred to S&DJR Nos 44–45 in 1928, retaken into LMS stock 1930
575–576 40575–40576 67 1929 Derby Replacement for engines transferred to S&DJR
577–579 40577–40579 49 1928 Derby
580 635 40635 49 1928 Derby Transferred to S&DJR No. 46 in 1928, retaken into LMS stock 1930.
580 40580 67 1929 Derby Replacement for engine transferred to S&DJR
581–600 40581–40600 49 1928 Derby
602–612 40602–40612 49 1928 Derby
613–628 40613–40627 67 1929 Derby
629–632 40629–40632 67 1930 Derby
636–660 40636–40660 76 1931 Crewe
661–665 40661–40665 77 1931 Derby
666–685 40666–40685 77 1932 Derby
686–700 40686–40700 85 1932 Crewe

Numbers 633 and 635 were fitted with Dabeg feedwater heater in 1933. Numbers 591 and 639 were withdrawn in 1934. After nationalisation in 1948, British Railways added 40000 to the numbers of the remaining 136 engines. Further withdrawals came between 1954 and 1962. All were scrapped.

Gallery

References

External links